Jasper County Democrat, Volume 11, Number 57, Rensselaer, Jasper County, 19 December 1908 — Page 3 Advertisements Column 3 [ADVERTISEMENT]

Northwest corner of Section Nineteen (19), Township Twenty-seven (27) North Range Five (5) West, in White County, Indiana, to the mouth of a tile ditch known as the Pugh ditch; to this point petitioners respectfully ask that said proposed ditch be constructed of drain tile of sufficient capacity, then from this last mentioned point by a construction of an open ditch of sufficient caEaclty following the route of said E. ~ Dibell ditch in a general easterly direction through Sections Nlneteen(l9), Twenty (20), Twenty-one (21), Twen-ty-two (22) and to a point near the Southeast corner of the Northwest quarter of Section Twenty-three (23), Township Twenty-seven (27) North, Range Five (5) West, in White County, Indiana, and there to terminate and. empty in a large dredge ditch known as the Eli Hoagland, et al.. (or Monon) ditch, into which said proposed ditch will empty and will have a good and sufficient outlet. 2nd. Also by the construction of Branch No. 1 to the main proposed ditch to be constructed of drain tile of sufficient capacity, beginning at a point twenty-five (25) feet South and sixtythree (63) rods and eleven (ll) feet West of the Northeast corner of the Northeast quarter of Section Twentyseven (27), Township Twenty-seven (27) North, Range Six (6) W'est, in White County, Indiana, thence following the course of Branch No. 1 of said E. L. Dibeil ditch in a general northerly direction to a point about eighty (80) rods West and thirty (30) rods North of the Southeast corner of the Northeast quarter of Section Twenty-two (22) in last mentioned Township and Range, thehce in a general Southeasterly direction to a point about thirtv (30) rous East and about eighty rods North of the Southwest corner of Section Twenty-four (24), Township Twentvseven (27) North, Range Six (G) West, in White County,' Indiana, and there terminate In the main proposed ditch where the same will have a good and sufficient outlet. 3rd. Also by the construction of Branch No. 1 of Branch No. 1 to said main proposed ditch, *to be constructed of tile of sufficient capacity, beginning